 The installation of the chicken manure dryer for organic fertilizer equipment shall be carried out in strict accordance with the requirements of the upper assembly drawing and the basic drawing. Before the installation of the chicken manure dryer for organic fertilizer equipment, its parts and auxiliary parts should be checked and wiped. Clean up and complete. Due to chicken manure dryer is a large long-body equipment, so it should be installed in this order and method:

1. Draw the base line: Make the mark on the base target board correctly, and the center target board should be embedded to achieve convenient and accurate use and consider that the base will not be covered after installation.

2. Install the base and the tug: level the position of the horn, draw the center line of the base and the tug, according to the requirements of the drawing, find the installation position of the base and the tug, level and lay it, first grouting the foundation hole, the concrete reaches a certain strength At the time, tighten the anchor bolts, and then install the sand dryer cylinder after the review is qualified.

3. Install the cylinder and the rolling ring: first install the rolling ring on the cylinder, and the concave joints required for fixing should be arranged in a positive-reverse staggered configuration, and the thickness of the shim should be adjusted to keep the contact between the rolling ring and the concave joint Corresponding gap, do not-cause, and spot weld concave shapeJoint bolt head and cylinder body.

4. Install the big gear: Before installation, check that there should be no collision marks on the interface of the docking surface, clean the contact surface of the big gear and the cylinder, and then carefully align the two gear halves and tighten the interface bolts, and then install the big gear on the cylinder. Physically. Rotate the cylinder, check

Check the radial runout and lateral swing of the big gear until the calibration is qualified.

5. Install the small gear, reducer and motor: According to the installed large gear, adjust the meshing parameters of the large and small gears and meet the requirements of the equipment. Fix the position of the small gear and reducer motor.

6. Install the gear cover: make it symmetrical with the edge of the gear.

After all the above-mentioned work is done, the second grouting shall be carried out. The requirements for grouting shall be carried out in accordance with the relevant regulations of civil engineering design. The installation review and debugging work related to grouting are carried out simultaneously to ensure the installation quality of the organic fertilizer equipment and chicken manure dryer.